Paradyne 7112 User Manual Page 78

  • Download
  • Add to my manuals
  • Print
  • Page
    / 156
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 77
Configuration Option Tables
A-2
7112-A2-GB20-10March 1998
Select . . . To Configure the . . .To Access the . . .
Telnet Port Telnet Session Options, Table A-7 Telnet user interface
SNMP General SNMP Management
Options, Table A-8
SNMP NMS Security Options,
Table A-9
SNMP Traps Options, Table A-10
Management support
through SNMP
System Options Menu
For System Options, refer to Table A-1. To access the System Options screen,
follow this menu selection sequence:
Main Menu
Configuration
Load Configuration From
System
Table A-1. System Options
Self Test
Possible Settings: Enable, Disable
Default Setting: Enable
Controls whether or not the DSU/CSU performs a self-test at power-up and after reset.
Enable – Self-test will be performed at power-up and after a reset.
Disable – Self-test is disabled. The DSU/CSU will still perform a few basic tests (such
as memory and program checksum).
Test Timeout
Possible Settings: Enable, Disable
Default Setting: Enable
Allows user-initiated tests to end automatically. Recommend enabling when the unit is
managed remotely through the FDL to avoid the requirement to terminate the test
manually.
Enable – User-initiated loopback and pattern tests end when test duration is reached.
Disable – Tests can be terminated manually from the Network Tests screen. Refer to
Running Network Tests
in Chapter 7.
NOTE: Tests commanded by the DTE or network-initiated tests are not affected by
this test timeout.
Test Duration (min)
Possible Settings: 1–120
Default Setting: 10
Number of minutes for a test to be active before automatically ending.
Test Duration (min) option appears when Test Timeout is enabled.
1 to 120 – Amount of time in minutes for a user-initiated test to run before terminating.
Page view 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 155 156

Comments to this Manuals

No comments