Paradyne ACCULINK 316x User Manual Page 126

  • Download
  • Add to my manuals
  • Print
  • Page
    / 211
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 125
ACCULINK 316x DSU/CSU
4-10 December 1996 3160-A2-GB22-10
Starting a Data Terminal Loopback
The Data Terminal loopback command (DTLB) loops
the data received from the selected port, for all DS0
channels allocated to the port, back out the port. This
loopback occurs after the data passes through the port
circuitry but before it reaches the T1 framer.
HANDLING
PRECAUTIONS
FOR
STA
TIC-SENSITIVE DEVICES
This product is designed to protect
sensitive components from damage
due to electrostatic discharge (ESD)
during normal operation. When
performing installation procedures,
however, take proper static control
precautions to prevent damage to
equipment. If you are not sure of the
proper static control precautions,
contact your near
est sales or service
representative.
To perform a Data Terminal loopback,
1.
Press F2 to select T
est from the top-level menu
screen.
F1
DS
U E
SF
Stat Test Cnfig
F2
F3
2. From the T
est screen, press F2 to select Lpbk.
F1
Test:
Rlpbk Lpbk Ptrns
F2
F3
3. From the Loopback screen, press four times
to display the DTLB selection on the screen.
F1
Loopback:
Abort LLB PLB
F2
F3
4.
Press F3 to select DTLB.
F1
Loopback:
RLB DCLB DTLB
F2
F3
5. From the DTLB screen, press the function key for
the port for which you want to perform the data
terminal loopback. Use the scroll keys, if
necessary.
F1
Loopback: DTLB
Prt1 Prt2 Prt3
F2
F3
Test Started appears on Line 2. If a Data
Terminal loopback is already in progress, the
Already Active
message appears. If an invalid
combination of loopbacks is in progress, the error
message I
nvalid Test Combo
appears (see
Table 4-2 for valid loopback test combinations).
Page view 125
1 2 ... 121 122 123 124 125 126 127 128 129 130 131 ... 210 211

Comments to this Manuals

No comments