Paradyne 9126-II User Manual Page 284

  • Download
  • Add to my manuals
  • Print
  • Page
    / 470
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 283
8. Troubleshooting
8-20
September 2002 9128-A2-GB20-80
Starting and Stopping a Test
Use this procedure to start, monitor, or abort specific tests. To abort all active tests
on all interfaces, see
Aborting All Tests
on page 8-21.
Start or stop an individual test using the same procedure.
Procedure
To start and stop a loopback or a send-pattern test:
1. Follow this menu selection sequence:
Main Menu
Test
2. Select an interface and test (e.g., Network, Data Port, or ISDN PVC Tests) and
press Enter.
The selected test screen appears.
Start
appears in the Command column.
Inactive
appears in the Status column.
3. Select the Port number and press Enter.
4. Select the DLCI number and press Enter if a PVC test has been selected.
The cursor is positioned at Start in the Command column of the first available
test and is highlighted.
5. To start the test, highlight
Start
under Command for the test you want to run
and press Enter.
Stop
now appears and is highlighted, and the status of the
test changes to
Active
.
The length of time that the test has been running is shown in the Result
column.
6. To stop the test, press Enter to send the Stop command.
Start
reappears
and the status of the test changes back to
Inactive
.
When the status of a test is . . . The only command available is . . .
Inactive Start
Active Stop
Page view 283
1 2 ... 279 280 281 282 283 284 285 286 287 288 289 ... 469 470

Comments to this Manuals

No comments