GranDSLAM® 4200ATM DSLAMInstallation GuideDocument No. 4200-A2-GN20-40January 2004
About This Guideiv January 2004 4200-A2-GN20-40Document SummaryA master glossary of terms and acronyms used in Paradyne documents is available on the
4200-A2-GN20-40 January 2004 1-11InstallationOverviewThe GranDSLAM® 4200 is a family of stackable DSLAMs designed for installation in the Central Offi
1. Installation1-2 January 2004 4200-A2-GN20-40PreparationConsider the following before installing the GranDSLAM 4200: Installation Site Your insta
1. Installation4200-A2-GN20-40 January 20041-3Cables RequiredTa ble 1-2 shows all the cables that may be required for your installation.Table 1-2. Ca
1. Installation1-4 January 2004 4200-A2-GN20-40Unpacking the HardwareHANDLING PRECAUTIONS FOR STATIC-SENSITIVE DEVICES This product is designed to p
1. Installation4200-A2-GN20-40 January 20041-5Table 1-3. Contents of Hardware Kit Shipped with the GranDSLAM 4200Appearance Description QuantityFlat-h
1. Installation1-6 January 2004 4200-A2-GN20-40Mounting Configurations Three basic installation configurations are available: Rack mount – see Inst
1. Installation4200-A2-GN20-40 January 20041-73. Identify six flat-head screws (for 19-inch racks) or six machine screws (for 23-inch racks) provided
1. Installation1-8 January 2004 4200-A2-GN20-40Installing the GranDSLAM 4200 Into a RackTwo types of mounting screws are provided. Use: #10-32 moun
1. Installation4200-A2-GN20-40 January 20041-93. Insert and tighten the screws in the top screw positions, then tighten the bottom screws. 4. Do not p
A January 2004 4200-A2-GN20-40Copyright © 2004 Paradyne Corporation.All rights reserved.Printed in U.S.A.NoticeThis publication is protected by federa
1. Installation1-10 January 2004 4200-A2-GN20-40Installing the GranDSLAM 4200 on a WallWall mounting requires two wood screws suitable for the weigh
1. Installation4200-A2-GN20-40 January 20041-116. Install two wood screws (not provided) at the same height above the floor and 18.75 inches (476.25 m
1. Installation1-12 January 2004 4200-A2-GN20-40Installing the GranDSLAM 4200 on a Shelf or DesktopIf the GranDSLAM 4200 will be placed on a shelf o
1. Installation4200-A2-GN20-40 January 20041-13Installing the Uplink ModuleEach GranDSLAM 4200 requires an uplink module for connection to the ATM net
1. Installation1-14 January 2004 4200-A2-GN20-403. Slide the uplink module into the guide rails just inside the opening. Press the uplink module fir
4200-A2-GN20-40 January 2004 2-12CablingCabling OverviewThe GranDSLAM 4200 has a large variety of possible cabling configurations. This chapter descri
2. Cabling2-2 January 2004 4200-A2-GN20-40DSL PortsThe GranDSLAM 4200 DSL connector supports the tip and ring connections of up to 24 DSL ports over
2. Cabling4200-A2-GN20-40 January 20042-3Uplink Module ConnectorsThe following types of uplink modules are available for the unit: Model 4201 T1 Upli
2. Cabling2-4 January 2004 4200-A2-GN20-404202 E1 Uplink Module ConnectorsThe 4202 E1 Uplink Module has two connectors, only one of which may be use
2. Cabling4200-A2-GN20-40 January 20042-53. Connect the other end of the cable to the appropriate network equipment such as a multiplexer.ProcedureTo
4200-A2-GN20-40 January 2004 B Important Safety Instructions1. Read and follow all warning notices and instructions marked on the product or included
2. Cabling2-6 January 2004 4200-A2-GN20-404203 T1/E1 IMA Uplink Module Port ConnectorsThe 4203 T1/E1 IMA Uplink Module supports eight operational T1
2. Cabling4200-A2-GN20-40 January 20042-74. Connect the other end of the cable(s) to the appropriate network equipment such as an ATM switch.Or, if th
2. Cabling2-8 January 2004 4200-A2-GN20-40Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke The 4203 T1/E1 IMA Uplink is shipped with a f
2. Cabling4200-A2-GN20-40 January 20042-9Management PortThe MGMT (management) port can be used to connect the GranDSLAM 4200 to a network management s
2. Cabling2-10 January 2004 4200-A2-GN20-40Console PortThe CONSOLE port normally serves as the primary user interface with the GranDSLAM 4200 during
2. Cabling4200-A2-GN20-40 January 20042-11ProcedureTo connect a modem to the CONSOLE port:1. Determine and procure the proper DCE cable type. The CONS
2. Cabling2-12 January 2004 4200-A2-GN20-40Alarm InterfaceThe alarm interface differs, depending on GranDSLAM 4200 model. Model 4210 – The ALARM in
2. Cabling4200-A2-GN20-40 January 20042-13ProcedureTo connect the ALARM interface:1. Strip the tips of the alarm source wires (about 1/2 inch or 12.7
2. Cabling2-14 January 2004 4200-A2-GN20-405. Connect the other end of the cable to your alarm monitoring system.Or, for Models 4220 and 4230, you c
2. Cabling4200-A2-GN20-40 January 20042-15Grounding LugProcedureTo connect the unit to a ground:1. Strip back the insulation approximately 5/16 of an
C January 2004 4200-A2-GN20-4013. The equipment is intended for installation in a max. 65° C ambient temperature, in an environment that is free of du
2. Cabling2-16 January 2004 4200-A2-GN20-40Power ConnectorThe GranDSLAM 4200 is powered by a –48 VDC source providing –40.5 to –57.0 VDC. Dual power
2. Cabling4200-A2-GN20-40 January 20042-173. Insert the plug into either the A or B power input terminal on the front panel of the GranDSLAM 4200.4. I
2. Cabling2-18 January 2004 4200-A2-GN20-40
4200-A2-GN20-40 January 2004 3-13LEDsLED LocationsThe locations of the System and DSL Port LEDs on the front panel of the GranDSLAM 4200 are shown in
3. LEDs3-2 January 2004 4200-A2-GN20-40LED MeaningsWhen power is first applied to the unit, it performs a power-on self-test. When this test is succ
4200-A2-GN20-40 January 2004 4-14ConfigurationOverviewThe GranDSLAM 4200 is designed to require minimal configuration before it can be accessed by a N
4. Configuration4-2 January 2004 4200-A2-GN20-40Using the CLI The GranDSLAM 4200 uses Transaction Language 1 (TL1) language for CLI commands and mes
4. Configuration4200-A2-GN20-40 January 20044-3 Command query. You can obtain help with CLI commands by typing a ? (question mark). A question mark a
4. Configuration4-4 January 2004 4200-A2-GN20-40GranDSLAM 4200 Turn-Up ProcedureYou can turn up your GranDSLAM 4200 through the Ethernet connection
4. Configuration4200-A2-GN20-40 January 20044-5Turn-up Procedure for Inband ManagementProcedureTo turn up the GranDSLAM 4200 using inband management:1
4200-A2-GN20-40 January 2004 DJapanClass A ITEThis is a Class A product based on the standard of the Voluntary Control Council for interference by Inf
4. Configuration4-6 January 2004 4200-A2-GN20-40Turn-up Procedure for Out-of-Band ManagementIn out-of-band management, you are managing the unit usi
4. Configuration4200-A2-GN20-40 January 20044-7Using the Web InterfaceTo access the web interface:Procedure1. Open your web browser. (Internet Explore
4. Configuration4-8 January 2004 4200-A2-GN20-40
4200-A2-GN20-40 January 2004 A-1AConnectors and Pin AssignmentsOverviewThe following sections provide pin assignments for: Management Port Connector
A. Connectors and Pin AssignmentsA-2 January 2004 4200-A2-GN20-40DSL Ports and POTS Splitter ConnectorsThe 50-pin RJ21X Telco connector labeled DSL
A. Connectors and Pin Assignments4200-A2-GN20-40 January 2004A-3Management Port ConnectorThe Management (MGMT) connector is an 8-pin unkeyed modular j
A. Connectors and Pin AssignmentsA-4 January 2004 4200-A2-GN20-40Model 4210 ALARM/BITS ConnectorThe alarm relay reports major alarms through the ALA
A. Connectors and Pin Assignments4200-A2-GN20-40 January 2004A-5Models 4220/4230 ALARM/BITS ConnectorThe alarm relay reports major alarms through the
A. Connectors and Pin AssignmentsA-6 January 2004 4200-A2-GN20-404201 T1 Uplink Module ConnectorThe 4201 T1 Uplink Module 100Ω connector is a single
A. Connectors and Pin Assignments4200-A2-GN20-40 January 2004A-74202 E1 Uplink Module Connectors The 4202 E1 Uplink Module has two types of connector
E January 2004 4200-A2-GN20-40
A. Connectors and Pin AssignmentsA-8 January 2004 4200-A2-GN20-404203 T1/E1 IMA Uplink Module Port ConnectorsThe 4203 T1/E1 IMA Uplink Module port c
4200-A2-GN20-40 January 2004 B-1BEquipment List Table B-1. GranDSLAM 4200 Equipment List (1 of 5)Description Model NumberGranDSLAM 4200 (24-Port) Reac
B. Equipment ListB-2 January 2004 4200-A2-GN20-40GranDSLAM 4200 (24-Port) ReachDSL with 4203 T1/E1 IMA Uplink Module, without POTS Splitter, with U.
B. Equipment List4200-A2-GN20-40 January 2004B-3GranDSLAM 4200 (24-Port) ADSL without Uplink Module, with 900-Ohm POTS Splitter, with U.S. defaultsInc
B. Equipment ListB-4 January 2004 4200-A2-GN20-40GranDSLAM 4200 (24-Port) ADSL with 4203 T1/E1 IMA Uplink Module, without POTS Splitter, with U.S. d
B. Equipment List4200-A2-GN20-40 January 2004B-54202 E1 Uplink ModuleIncludes Installation Instructions.4202-B1-0004203 T1/E1 IMA Uplink ModuleInclude
B. Equipment ListB-6 January 2004 4200-A2-GN20-40
4200-A2-GN20-40 January 2004 C-1CTechnical SpecificationsTechnical specifications are subject to change without notice. Table C-1. GranDSLAM 4200 Tech
C. Technical SpecificationsC-2 January 2004 4200-A2-GN20-40Interfaces GranDSLAM 4200:DSL PORTS: 50-pin RJ21X Telco-type connectorPOTS: 50-pin RJ21X
4200-A2-GN20-40 January 2004 IN-1IndexNumerics100-ohm port description, 1-3120-ohm port description, 1-375-ohm port description, 1-3Aadministrator,
4200-A2-GN20-40 January 2004 iContentsAbout This Guide Document Purpose and Intended Audience . . . . . . . . . . . . . . . . . . . . iii New Feat
IndexIN-2 January 2004 4200-A2-GN20-40Gglossary URL, ivGranDSLAM 4200features, 1-1models, 1-1grounding lug, 1-8, 2-15Hhardware kit contents, 1-5I
Index4200-A2-GN20-40 January 2004IN-3T1/E1 IMA Uplink Moduleconnecting, 2-6ferrite choke, 2-8pin asssignments, A-8RJ48C connectors, A-8technical s
IndexIN-4 January 2004 4200-A2-GN20-40
Contentsii January 2004 4200-A2-GN20-403 LEDs LED Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-
4200-A2-GN20-40 January 2004 iiiAbout This GuideDocument Purpose and Intended AudienceThis document is written for technicians who install the GranDSL
Comments to this Manuals