Paradyne 7510-A2-GB20-00 727 User Manual Page 43

  • Download
  • Add to my manuals
  • Print
  • Page
    / 70
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 42
Testing
5-10
7510-A2-GB20-00
March 1997
Ending an Active Test
A test initiated by the user can be ended by the user.
A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test after it has been running a specified period of time.
Refer to System Options, Table A-1.
Test Timeout does not pertain to tests commanded by the:
Network, such as the network-initiated CSU and DSU Loopbacks.
DTE, such as the DTE-initiated Local Loopback.
On each test screen is a command column. Pressing Return when the cursor
is on the Stop command stops the test.
Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network or DTE-initiated loopbacks.
Command Complete appears when all tests on all interfaces have been
terminated.
Page view 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 69 70

Comments to this Manuals

No comments